Photo of the construction process of Shophouse Vinhomes Ocean Park 50 days, price 930 million, MV - a unit specializing in the design and construction of Shophouse, Vinhomes villas

Công ty Xây dựng MV có kinh nghiệm thiết kế construction hoàn thiện nhiều Shophouse, Biệt thự tại các dự án Vinhomes like Vinhomes Ocean Park , Smart City, Garnenia, etc.

Choose MV, you will get many benefits:
1- Fast application (less than 60 days)
2- Competitive price (best price in Vinhomes Ocean Park area)
3- And High Quality (construction supervisor is 100% time on the project)
Thanks to mastering the construction techniques of Vinhomes Ocean Park, knowing the location, drawing data, applying for construction permits, and a team of abundant and highly technical human resources.

Here are the pictures of the completed construction of the shophouse at Vinhomes Ocean Park that the MV has done:

DESIGN AND CONSTRUCTION SHOPHOUSE VINHOMES OCEAN PARK

Address: Pearl Row 6 – Vinhomes Ocean Park

Acreage: 70m2 x 4.5 floors

Cost of construction : 93,000,000 VND (see details at the end of the article)

Construction time: 50 days

***

VIDEO AFTER COMPLETION:

AND INVITE YOU TO SEE THE CONSTRUCTION PROCESS:

Carefully equipped and trained each worker, also showed the perfectionism and meticulousness in the completion of MV products.

The mesh shielding the building is square, straight and flat, creating a beautiful image for the project as well as the landscape of Vinhomes Ocean Park. Careful from small things, will remind workers to be careful for the work.

View of the Pearl Trai Shophouse, in urban area Vinhomes Ocean Park viewed from above

Transfer of materials to the site - construction of shophouse Vinhomes Ocean Park

7 am is the time when workers start working. Together with the same uniform, unite the spirit of teamwork and solidarity to complete the works well.

To achieve high progress, the company always allocates a large number of employees, and arranges jobs interlaced, not waiting: masonry, electricity, water, plaster, paint ...

Construction of plastering the bottom of stairs

Construction of joining formwork for stairs Shophouse Vinhomes Ocean Park

Technique, discipline, high sense of responsibility, good completion of works with quality, progress, labor safety, are the criteria of MV Construction Company.

If you have a need to design and construct Shophouse, Villa in Vinhomes projects, please contact:
MV Construction Company
Address: 15 Tran Dai Nghia, Bach Khoa ward, Hai Ba Trung, Hanoi
Phone: 0908.66.88.10 - 09.0202.5707
Website: https://moivaonhatoi.com

STILL STILL – SOME CONSTRUCTION DETAILS AT VINHOMES OCEAN PARK:

Don't rush to switch pages! This is the important part! Please see some construction details at the shophouse Vinhomes Ocean Park to see the construction process, care and details of MV company.

The villas and shophouses at Vinhomes Ocean Park are sealed with concrete, so the first stage of construction is to punch the concrete floor according to the design to place stairs and elevators (if any).

This concrete floor perforated part is constructed in a quick time (about 4 days, including waste disposal). The demolition time is so fast, because MV staggered the floors (eg 1-3 and 2-4) to destroy many floors at the same time while still ensuring safety. Waste will be neatly bagged and removed from the construction site.

After breaking the floor, it is necessary to immediately construct the stairs, this is also the secret to speeding up the progress of the project. Speed up the project for 2 reasons:
– Concrete floors take a long time to dry, so concrete parts must be made in advance to be able to remove the formwork early and still have enough days.
– Creating paths, helping workers to travel conveniently, will execute works faster.

Cốp pha được sử dụng loại ván Plywood Phủ phim (thay thế cho ván cốp pha gỗ rồi trải bạt), cũng làm tăng tốc độ đóng cốp pha, tăng tốc độ thi công. MV thường mất không quá 3 ngày để hoàn thiện 1 tầng cầu thang, một tốc độ rất nhanh chóng.

The ladder structure is penetrated deeply, clinging to the surrounding walls, creating a fulcrum, making the ladder more solid, linked with the old structure of the shophouse.

Construction time is fast but still must ensure quality and sharpness. Although the steel structure is hidden inside the concrete, it still has to be squarely woven, carefully checked by the supervisors, and sent to the owner before the concrete is poured.

Additional steel beams, will be connected to the old beams of the house by the method of drilling and transplanting steel using Ramset glue. Here, each beam, MV will use 5 D20 steel bars, this is also a very solid structure compared to the common ground of Ocean Park (the surrounding apartments usually only make 4 D18 steel bars).

Transplanted steel bars, and beam steel bars are connected by a combination weld to tie steel wire, which is very strong, and much stronger than the method of simply tying wire rope.

The stairs are built with square bricks. Please note, whether the level of concrete pouring of the stairs is high or not is shown in 1 point, that is, is the height from the concrete slab to the stairs even, and whether it is thin. Thin means standard concrete calculation, no need to use a lot of bricks to compensate for elevation.
Please see the photo below to see the "thin" of the shophouse built by MV

The stairs after construction are very "thin", beautiful, showing the correct calculation when pouring concrete

Building stairs is very beautiful and beautiful, the outermost bricks are built of solid bricks, preventing cracking when installing stair handrails later. The bricks inside are made of hollow bricks to create lightness for the stairs

The image above is the stage of preparing the wall wire mesh, helping the plaster layer of the new and old walls to be bonded together more tightly, avoiding cracking.

Công nhân đang đóng lưới liên kết lớp vữa trát tường mới và cũ

New and old walls have been linked together by iron beards, connecting bricks, but the process of gluing the mesh connecting the outer plaster layer is also an additional step, in order to strengthen the connection. old new wall

The electrical and plumbing shafts of the house are technical boxes.

These technical axes show high skill or not in neat pipe work, neat corner bending, saving materials.

MV Construction Company
Address: 15 Tran Dai Nghia, Bach Khoa ward, Hai Ba Trung, Hanoi
Phone: 0908.66.88.10 - 09.0202.5707
Website: https://moivaonhatoi.com

The photo above is the stage of laying floor tiles on the 1st floor of the Vinhomes Ocean Park townhouse using a "balanced keel". This glue helps the copper tiles to be almost perfectly flat with each other, the floor will be much more beautiful than conventional "hands-on" tiles.

Ốp bằng công nghệ mới cũng giúp những người thợ “nhàn” hơn, và thi công nhanh hơn, đỡ phụ thuộc vào tay nghề vì đã có công nghệ kĩ thuật hỗ trợ.

Quy trình lắp đặt ke cân bằng (ke thăng bằng) đều tăm tắp.

One day, a handyman can finish a wall for 1 bathroom.

The image above looks like clearing landmines? But no, MV workers are sanding, the wall has been smoothed by machine. This is another technology secret that helps speed up construction many times.
With this machine, with its extension rod, the worker will not need to build a ladder or a spear, saving time. And the workers are also much more relaxed when just putting the machine up, the wall is flat

TOTAL DESIGN COST OF SHOPHOUSE VINHOMES OCEAN PARK:

1 CONSTRUCTION Auxiliaries (Fences, tarpaulins, ELECTRICAL WATER ...) 20 million
2 CONSTRUCTION 450 million VND
3 ELECTRICITY WATER INFRASTRUCTURE 180 million
4 ELECTRICAL EQUIPMENT, WC 80 million
5 PLASTIC SLIPPING, SON BA TUONG 80 million
6 GLASS EDGE , GLASS DOOR 30m
7 AIR-CONDITIONER 70 million
8 CAMERA, NETWORK, Firefighting 20 million
TOTAL COST 93,000,000 VND

VIDEO AFTER COMPLETION:

Thank you for visiting the project. Our MV company still has many "technologies", "secrets" to make the project FAST and QUALITY, but due to the length of the article it cannot be extended, so see you in the next projects. If there is a chance, the MV looks forward to one day working with you to create beautiful and satisfactory houses! Thank you.
Please contact:
MV Construction Company
Address: 15 Tran Dai Nghia, Bach Khoa ward, Hai Ba Trung, Hanoi
Phone: 0908.66.88.10 - 09.0202.5707
Website: https://moivaonhatoi.com

en_USEnglish