INTERIOR DESIGN AND CONSTRUCTION OFFICE K-MEDIA COMPANY
Place: Eco Green City office building for lease, 286 Nguyen Xien, Hanoi
Acreage: 150m2
total cost of construction: 230 million (see details at the end of the article)
Construction time: 15 days
- 2020 -
***
Today, Please Come In, I would like to introduce to you a new 150m2 office space designed and constructed in just 15 days at a cost of less than 200 million. Condition before construction: not smoothed floor, no lighting system, no electrical system, no partitions with the outside area. Please join us in the tour of the project, going back in time from the past to the present, to see how we constructed and transformed an office!
CURRENT STATUS OF OFFICE WHEN RECEIVING TABLE:

The office is located in the service area of Eco Green City apartment building, Nguyen Xien, which was handed over in raw form, could not be used immediately, still lacking basic items such as electrical system, floor (concrete). the concrete has not been smoothed yet), the system of lights, fans, air conditioners, partitions with the outside area ... Therefore, the workload is a lot, plus the requirements of the investor is to execute quickly to keep up. pay the old office and move here.

There is no partition between the office and the common corridor of the building. The floor is currently a rough concrete that has not been plastered yet, so it cannot be directly paved, but must be leveled first.


Design drawings of 3d INTERIOR office:

Due to the urgent time, the 3D design only stops at a basic level, enough to visualize the table position, later will arrange sockets, lights, corresponding air conditioners, pressing plates. next to the wall.

The 3D design is simple, but the main idea is already up to start construction office furniture.

CONSTRUCTION OF OFFICE INTERIOR - DAY 2:

This is the second day of construction, when we are sinking electrical systems for sockets and switches. The bare bones and plaster walls are also being erected quickly.

The partition with the outside is erected first, to avoid dust, and ensure privacy for the construction area. The partition uses double-sided drywall, the 52 mm thick Vinh Tuong skeleton.

CONSTRUCTION OF OFFICE INTERIOR - DAY 5:

On the 5th day of construction, the plasterboard part was being painted, and the concrete floor of the building was also being smoothed to spread carpets later.

Covering the floor will make the floor damp and do not carpet right away, especially buildings without windows to get fresh air like this office. Therefore, the screeding has been done early, right after finishing the rough plaster, to avoid collision damage to the flatness of the floor, as well as the floor dry before carpeting.

CONSTRUCTION OF OFFICE INTERIOR - DAY 08:

The 8th day of the construction process, equivalent to from the beginning of the week to the end of the week, the office has been completely changed, the glass walls have been installed, electricity, ceiling lights, sockets have been installed.

Basic paint finish, next will be painted gray ceiling and painted blue decorative wall

CONSTRUCTION OF OFFICE INTERIOR - DAY 11:

Image of the 11th day of the construction process, which took less than 2 weeks, but the office has changed radically, from the existing unpolished concrete floor, without the electrical system and painting, so far it has been completed. new office version, only waiting for installing carpets and furniture.

Workers of the Home Invitations I am installing a cassette ceiling air conditioner

CONSTRUCTION OF OFFICE INTERIOR - DAY 14:

After just 2 weeks, the rough office space has become a complete office and can be put into use. The carpet is being assembled.


AND IMAGE OF CONSTRUCTION AFTER 15 DAYS OF COMPLETION:

In addition to reasonable construction costs, fast construction design time also helps reduce office rental costs for customers. With the above surface area, each day of earlier construction will help investors save about 1,000,000 VND

Due to minimal construction costs, office ceilings are left bare and painted gray, not plaster ceiling. Lighting fixtures are modern style rectangular LED light troughs.

Some of the walls are painted blue according to the company's brand identity.

The lighted area, near the entrance, is chosen to be the seating, drinking and resting area for staff.

Office area with a capacity of 20-25 people.


The system of painted / black painted ceilings, revealing technical pipes, helps reduce construction costs, still creates aesthetics, and keeps the ceiling height so that ceiling fans can be installed, and creates ventilation throughout the office.

6 drop light fixtures that are utilized from the old office are also harmoniously installed in the new office

The main light of the office uses a modern black painted rectangular LED box light

You have just seen the design process office construction an area of 150m2 in Eco Green City, Nguyen Xien, with a large workload (raw handover building), minimal cost 150 million and construction time only 15 days.
cost of construction of k-media office:
TT | CONSTRUCTION ITEMS | COST OF CONSTRUCTION |
1 | Laying, foundation 5cm, carpet and plastic floor | 50,000,000 VND |
2 | Paint bare gray | 10,000,000 VND |
3 | Plasterboard, wall paint | 50,000,000 VND |
4 | Glass wall, glass door | 30,000,000 VND |
5 | Electrical system, network | 70,000,000 VND |
6 | Curtain | 15,000,000 VND |
7 | Decal, logo | 5,000,000 VND |
8 | Design fees | Free |
TOTAL (Not including tables and chairs) | 230,000,000 VND equivalent 1,500,000 VND / m2 | |
9 | Tables + chairs for 26 people | 36,000,000 VND |
TOTAL (Furniture included) | 266,000,000 VND equivalent 1,770,000 VND / m2 |